  cableties Premium join:2005-01-27
·Verizon FIOS
| reply to cdru Re: Solution?-
This is about the installation, not the prep (ground, pole, underground...) which the subcontractors already did (or messed up depending on who said what).
I go with the age of homes, the scheduling and infrastructure.
My install took less tahn 2 hours. That is becuase I did ALL the prep (board with punchdown, house-LAN, termination ready, and EASY access). I bet only .1% have such prep done for the FIOS guys. |
|
  cdru Go Colts Premium,MVM join:2003-05-14 Fort Wayne, IN
| said by cableties :This is about the installation, not the prep (ground, pole, underground...) which the subcontractors already did (or messed up depending on who said what). I was only commenting on the early prep work. The installation from the drop on the pole/post to the house is another story. But if they are breaking utilities during that phase, either the utility wasn't buried nearly deep enough or they are cutting way too deep. -- Go Colts |
|