site Search:


 
    All Forums Hot Topics Gallery






how-to block ads


 
Search Topic:
Uniqs:
194
Share Topic
Post a:
Post a:
AuthorAll Replies

unknownone

join:2007-07-21
Elmhurst, NY
Reviews:
·Verizon FiOS

Question about Wiring up for ADSL2=

Hi,

I have a question, I'm preparing to order ADSL2+ from Lightening bolt but need to get the inside wiring ready before ordering being that the lighting bolt install package doesn't include running inside wiring. My question is for the ADLS2+ (15/1 with 8 static ips) from the dmark/nid to the place I want the phone jack, do I run CAT-5e and does the dry line used all 4 pairs wires? if there are unused pairs; should/could I use the unused pairs for voice lines or is it not recommended? I'll like to know this before having the phone guy gives me a quote how how much and what's going to be done.

Thanks.


LBDSL
Lightning Bolt
VIP
join:2002-01-07
Auburn Hills, MI

All you need is 1 available pair of copper from the NID to the location your want the DSL router. If your building already has an available pair, you are all set. if not, then yes you need to have a pair run, as our install uses existing wiring, we don't run new wiring.

a DSL loop, or voice loop for that matter, uses one pair per line.
--
Lightning Bolt Technologies


Monday, 28-May 13:03:31 Terms of Use & Privacy | feedback | contact | Hosting by nac.net - DSL,Hosting & Co-lo
over 12.5 years online © 1999-2012 dslreports.com.
Most commented news this week
Hot Topics