  sbrook Premium,Mod join:2001-12-14 H0H 0H0
·Rogers Hi-Speed
Host: Rogers Bell Canada
| reply to habskilla Re: Rogers Usage
His problem is Rogers billing him ... That's the significant one!
More to the point, it's my understanding that billing is done by assigned IP which makes modem cloning moot.
Don't ya wish that Rogers would tell us how this stuff is supposed to work instead of us just guessing? |
|
 a_large_rock
join:2003-08-02 Markham, ON
·Cogeco Cable
·Rogers Hi-Speed
1 edit | Yeah it would be great if they told us how they were billing us. Gas meters, water meters and hydrometers all have to be certified
and if your hydro usage all of a sudden jumps 10 fold you can challenge it and the meter can be tested for accuracy. How do you do that with rogers when they wont even tell you how they are measuring it, and what hardwares being used. The measuring equipment at work is certified and inspected to comply with the Weights and Measures Act and I know gas pumps are too.. so why not bandwidth meters? Considering how inaccurate they are.. and how rogers still plans on using the broken system. |
|