 gar187erI do this for a living join:2006-06-24 Dover, DE kudos:1 | thank you karl thanks for posting a pic completely irrelevant to the topic at hand.
This was about temp drops being left unburied. which over 75% of the time are handled by contractors and not by the cable cos directly. forms are filled out, customers sign a waiver, and its submitted to the company for them to come out and bury.
the pic posted is of a lazy install.
the topic should be lazy drop crews.
installs have nothing to do with drop buries.
here in DE temps are laid all the time. Except to cross roads...gotta be creative about those....hell we've even left parked bucket trucks on the side of the road to run cable over a road until a crew can get out there to bore a road. and as with permits they take time...and money, especially when dealing with subdivisions....
i along with every other cable guy on here would appreciate a change in the title of this article...
"baltimore to fine for unburied cable drops" would work.... |