Datacenter Setup |
|
Oxygen
1 recommendation |
Oxygen
Premium Member
2010-Apr-26 6:19 pm
Cisco Catalyst 3750G stack for GigE transport services, uplinked with 4x SMF-LR SFPs with 5x copper GigE downlinks. A tasty 3750G-12S underneath it sitting unused with an equally tasty SMF long haul SFP.
Some ADC fiber cross-connect cabinets and the fiber patching...
Some rare ONI Systems Online2500 gear for carrier ethernet transport along with a WRN VLX2020 for OC-192/STM-64 SONET services.
A lonely but tricked out Catalyst 5505 with a never-before-seen SMF-LR GigE uplink card in the supervisor and a few lonely fast ethernet drops. |
|
Oxygen |
Oxygen
Premium Member
2010-Apr-26 6:26 pm
It's the Matrix. |
|
Oxygen
1 recommendation |
Oxygen
Premium Member
2010-Apr-26 6:31 pm
Monster-sized batteries to backup all 6 pieces of equipment.. |
|
|
to Oxygen
i think i can say with 100% certainty that the fire/code/building inspectors haven't been throught there in a while...... wow.... for an AC plenum area i can also pretty much guarantee there's not much airflow through there... |
|
|
to Oxygen
nice! thanks for sharing |
|
drslash (banned)Goya Asma join:2002-02-18 Marion, IA |
to Oxygen
Thanks! |
|
OxygenTimes Square can't shine as bright Premium Member join:2001-12-04 Huntington Station, NY
1 recommendation |
Oxygen
Premium Member
2010-Apr-27 2:07 am
|
|
TomS_Git-r-done MVM join:2002-07-19 London, UK |
TomS_
MVM
2010-Apr-27 5:12 am
Damn, thems be some thick cables! How many sq/mm are they? Biggest cable Ive worked with so far is 25mm/sq, not a lot, but big for me. |
|
|
to Oxygen
Is that in 60 Hudson? |
|
jmich Premium Member join:2001-08-28 Toms River, NJ |
to Oxygen
Very nice pics, thanks for sharing. That ceiling shot is ridiculous! |
|
|
OxygenTimes Square can't shine as bright Premium Member join:2001-12-04 Huntington Station, NY |
to battleop
Maybe... what makes you say that? |
|
|
I've seen some pictures of 60 Hudson's hallways and heard about the absolute wiring mess that is/was in that building. |
|
OxygenTimes Square can't shine as bright Premium Member join:2001-12-04 Huntington Station, NY |
Oxygen
Premium Member
2010-Apr-28 4:50 pm
In that case, yes, this is a suite at 60 Hudson. |
|
drslash (banned)Goya Asma join:2002-02-18 Marion, IA |
to battleop
|
|
OxygenTimes Square can't shine as bright Premium Member join:2001-12-04 Huntington Station, NY |
Oxygen
Premium Member
2010-Apr-28 5:07 pm
Damn! 2004? I was like what... 15 or 16 years old then. Guess you can say that I'm all about the 3rd floor at 60 Hudson. |
|
|
to Oxygen
Did you guys rack those Absolyte battery jars? Those things SUCK.
I spent a week unloading, transporting, and then reloading jars last summer in the desert heat while we built four new cell sites and it was miserable. |
|
kewlkeedGrouch Premium Member join:2005-02-05 Knowlton, QC |
to Oxygen
I'll second that, they're f****ing miserable little pukes! |
|
OxygenTimes Square can't shine as bright Premium Member join:2001-12-04 Huntington Station, NY |
to Hahausuck
Nope. I only press keys on the keyboard. |
|
LazMan Premium Member join:2003-03-26 Beverly Hills, CA |
to Oxygen
Oh, suck it up, ladies... The Absolytes aren't that bad... We just did a rack of flooded cells at 680# a jar... About 17,000 pounds for the string and racking. Or, roughly twice the weight of the one's pictured here. I am a little surprised at the Cat5500 - they were MD'd several years ago, and many companies have removed them from service... Overall, pretty nice work! |
|
|
Hahausuck
Premium Member
2010-May-10 12:09 am
Damn.... Ok, thats heavy. |
|
OxygenTimes Square can't shine as bright Premium Member join:2001-12-04 Huntington Station, NY |
to LazMan
said by LazMan:I am a little surprised at the Cat5500 - they were MD'd several years ago, and many companies have removed them from service... The Catalyst 5500 is from an inter-floor cross-connect company that pretty much places one of those bad boys on every floor, in every suite. Basically if you want 100mbit ethernet from Suite X on Floor 4 to Suite Y on Floor 8, they tell you "plug into port 5/3 on the 4th floor and it will be trunked to port 6/1 on the 8th floor" I guess it works.. |
|
LazMan Premium Member join:2003-03-26 Beverly Hills, CA |
to Hahausuck
One of the offices I maintain has 9 sets of flooded cells... Just shy of 110,000#. On the 3rd floor. Ain't being a power guy fun??? |
|
|
Hahausuck
Premium Member
2010-May-10 10:05 pm
said by LazMan:One of the offices I maintain has 9 sets of flooded cells... Just shy of 110,000#. On the 3rd floor. Ain't being a power guy fun??? Yeah. I have to admit I wish I worked around it more often. Most of the time I am just designing additional equipment spots or more racks with Newmar GMT fuse panels. Rarely do I get to help out the techs with site construction. |
|