site Search:


 
    All Forums Hot Topics Gallery






how-to block ads


 
Search Topic:
Uniqs:
17594
Share Topic
Posting?
Post a:
Post a:
page: 1 · 2 · 3 · 4 · 5
AuthorAll Replies


jmich
Premium
join:2001-08-28
Toms River, NJ
Reviews:
·Verizon FiOS

Analog Voice Gateways

Click for full size
Gateways and switches for local phones
Click for full size
Supplemental to VoIP rollout for analog phones on a large campus.


sedorox

join:2006-06-23
Williamsport, PA
kudos:1

Holy FXS Ports....
I like!
I'm assuming thats 16 FXO and 8 T1's pictured?
Did you run each switch back to your core?



jmich
Premium
join:2001-08-28
Toms River, NJ

each switch is connected to core in main building. As for the ports, I believe you are correct on the count. This is also the Dmark for the campus voip system. There are several other gateways across campus for other analog phones.



sedorox

join:2006-06-23
Williamsport, PA
kudos:1

Sweet!
Are you using CUCM, or you just using their equipment for something like Asterisk?
Nice setup, hopefully when you cable it up, it stays just as clean



jmich
Premium
join:2001-08-28
Toms River, NJ

you lost me at CUCM..my expertise ended at the fiber terminations and the analog cross-connects



alphapointe
Don't Touch Me
Premium,MVM
join:2002-02-10
Columbia, MO
kudos:2

CUCM = Cisco Unified Call Manager



jeffmoss26

join:2002-07-22
Beachwood, OH

reply to jmich
any pics of the other side of the 25 pair terminations?


calvinj

join:2011-08-16
united state

reply to jmich
Curious what are the model of those?


Smokeshow
Premium
join:2009-02-26
Cold Lake, AB

I'm pretty sure that those are Cisco VG224's.



jmich
Premium
join:2001-08-28
Toms River, NJ

reply to jeffmoss26
next time I'm thru there I'll snap a few pics. Nothing fancy just 110 blocks on the wall.



sedorox

join:2006-06-23
Williamsport, PA
kudos:1

reply to jmich

said by jmich:

you lost me at CUCM..my expertise ended at the fiber terminations and the analog cross-connects

Ahh ok, terminating fiber is fun too


battleop

join:2005-09-28
00000

reply to Smokeshow
I thought they were 2431-16FXS at first but they are missing the WIC slot so they are probably 224s. We used to deploy the 2431 as a CPE at a customer site. We replaced them with Adtran TA900s because they are cheaper, have free support, free AOS updates, easier to troubleshoot, and they are more flexable.



jmich
Premium
join:2001-08-28
Toms River, NJ
Reviews:
·Verizon FiOS

reply to jeffmoss26

Click for full size
wall field
Click for full size
waterproof cabinet
Click for full size
conduits to ladder rack
Click for full size
Click for full size
inside
Click for full size
old roll pbx
Click for full size
UPS pre- generator


AMD Phreak
Pork eating crusader
Premium
join:2003-12-14
Cell Tower
kudos:1

reply to jmich
That frame looks like it might be in decent shape and not all messy.

What's up with the weatherproof cabinet inside the building?


TheMG
Premium
join:2007-09-04
Canada
kudos:2

said by AMD Phreak:

What's up with the weatherproof cabinet inside the building?

I was just about to ask the same question...

cramer

join:2007-04-10
Raleigh, NC
kudos:7

reply to AMD Phreak
If I had to guess... air conditioning. I've seen that done a number of places. (mostly in closets.)



AMD Phreak
Pork eating crusader
Premium
join:2003-12-14
Cell Tower
kudos:1

yeah ok but that doesn't really solve the problem. once you hvac a box like that in another space, you still need to be able to deal with the heat removed from the interior of said box.
--
"Saying something in another language that you don't think the other person understands is just saying that you're a pussy and are too afraid to say it in English." --Harddrive



jmich
Premium
join:2001-08-28
Toms River, NJ

reply to AMD Phreak
roof leaks...we scratched our heads too.


BiggA

join:2005-11-23
EARTH

reply to jmich
Why all this for an obsolete technology? Why not just do VOIP directly and get rid of the phone wiring altogether?



AMD Phreak
Pork eating crusader
Premium
join:2003-12-14
Cell Tower
kudos:1

reply to jmich
So it was cheaper to put that cabinet in than fix the roof. Ok that makes sense.

That roof must have been expensive to fix because a properly done up box like that is 7 to 10 grand easily. Of course they probably cheaped out on that too so that's why it might likely be the reason it is there.
--
"Saying something in another language that you don't think the other person understands is just saying that you're a pussy and are too afraid to say it in English." --Harddrive


Tuesday, 18-Jun 03:05:21 Terms of Use & Privacy | feedback | contact | Hosting by nac.net - DSL,Hosting & Co-lo
over 13.5 years online © 1999-2013 dslreports.com.
Most commented news this week
Hot Topics