 Ray422Premium,MVM join:2002-03-04 Lost kudos:11 Reviews:
·RoadRunner Cable
| reply to Ray422
Re: WCG Milestones and Climbers for 01/18/2012 Update 2: The original 2 workers got back right on time at 1pm, but they sat in the truck until 1:25. Another truck of 2 arrived with 4 sticks of 20 foot long PVC, they only needed about 6 inches. 2 people worked for 15 minutes, while 2 supervised. Then they all 4 had a pow-wow until break time at 2pm. Those county workers move so fast, all you see is a blue streak.
I walked out at 2:45 to meet them. Turns out that the broken PVC connects to steel pipe. Rut-row, they couldn't handle that, so they had placed an emergency call for the county plumber. Although they knock-off at 3:30, they promised to stay until I had water. Musta needed some overtime.
The county plumber arrived at 3:01pm, then I had 6 worker bees. At 3:25 everyone was gone. Those guys fooled with that leak most of the day, but the county plumber fixed it in 20 minutes.
What a fiasco, now we don't have to behave like bears  -- Things I like - Team Discovery - Quads©3.3 to 4.1ghz - Strawberry Ice cream How's that hopey changey thingy working out for ya?
|