 | reply to fotomatt1
Re: Verizon FINALLY pulling cable in my NYC apartment building!! said by fotomatt1:Well it looks like Verizon connected the demarc to the conduit in the street on Friday. Looks like everything is connected in the basement of my building...I'll try and take a picture later if I can. Hopefully my building will be provisioned soon and I can place my order. Anybody know how long it takes for Verizon to provision a building from the time the installation is complete? Within a week of everything being lit, it should be provisioned in the system & you can order service! |
|
 | I wish I could tell if the installation is actually done. Everything looks like it's closed up and connected at the demarc....I'm not sure if they have to do anything else on each floor in my building. |
|
|
|