site Search:


 
    All Forums Hot Topics Gallery






how-to block ads


 
Search Topic:
Share Topic
view:
normal
Posting?
Post a:
Post a:
Links: ·Forum FAQ ·diy online
AuthorAll Replies


AVD
Respice, Adspice, Prospice
Premium
join:2003-02-06
Onion, NJ
kudos:1

reply to Draiman

Re: Garage addition

You are not getting the job done turnkey?

Who hired the designer? The framing contractor?

Also for new construction and qualifies roofer should be able to quote based on the drawings.


Draiman
Let me see those devil horns in the sky

join:2012-06-01
Kill Devil Hills, NC
Reviews:
·Verizon FiOS

said by AVD:

You are not getting the job done turnkey?

Who hired the designer? The framing contractor?

Also for new construction and qualifies roofer should be able to quote based on the drawings.

The contractor sold it as a one stop shop project but also had allowances on some stuff in case I wanted to do upgrades or anything special. The contractor is handling everything except the doors and electrical as far as the garage goes. They don't do painting or asphalt either so that's all on me to get done.

Thursday, 20-Jun 01:13:11 Terms of Use & Privacy | feedback | contact | Hosting by nac.net - DSL,Hosting & Co-lo
over 13.5 years online © 1999-2013 dslreports.com.
Most commented news this week
Hot Topics