Re: First new site for us we are moving in.

Cool thanks I was wondering it it was okay to ground it directly to outside where all the other grounds were or if I needed to also ground to the inside utilities?


WHT

join:2010-03-26
Rosston, TX
kudos:5
reply to viperm
copper strap is a preferred way over around wire


viperm
Carpe Diem
Premium
join:2002-07-09
Winchester, CA

1 edit
reply to viperm
There used to be a radio station on the site who left recently. Now we have the rack and existing power etc. Looks like the Genset backs up power to the whole site but maybe only just the cell providers. The main electrical panel feeds right thru our portion of the building so I will be able to look further in the next week to determine which circuit goes where and if we also have generator back up which would be a nice bonus..

I did have a question on that copper ribbon ground from the base of the tower to the inside rack, who safe and reliable is that? Any suggestions for it or do you think it will be okay?

Should I also run an 8 guage ground from the rack to the main electrical feed panel?

Its about 120' tower we will be at 60' for the UBNT sector and PTP dish.

Thanks
--