dslreports logo
site
 
    All Forums Hot Topics Gallery
spc

spacer




how-to block ads


Search Topic:
uniqs
57
share rss forum feed view:
normal
This is a sub-selection from [ALL] Ask a Shaw Rep

Lesaonar

join:2000-07-25
Victoria, BC
reply to don

Re: [ALL] Ask a Shaw Rep

said by don:

Any idea when phase 2 is rolling out in Victoria?

Has already happened in Gordon Head. Perhaps you should be more specific about the area you live in?
--
Anon filter enabled. Register an account if you want to be taken seriously.

adiabatic

join:2009-01-24
Victoria, BC
said by Lesaonar:

Has already happened in Gordon Head. Perhaps you should be more specific about the area you live in?

Interesting. Roughly when did that happen? I'm in View Royal near the hospital and BB100 is still 5 Mbps up.

Lesaonar

join:2000-07-25
Victoria, BC
said by adiabatic:

Interesting. Roughly when did that happen? I'm in View Royal near the hospital and BB100 is still 5 Mbps up.

The area of Gordon Head we're in, about 8 blocks from UVic, was finished in spring of last year.
--
Anon filter enabled. Register an account if you want to be taken seriously.
This is a sub-selection from [ALL] Ask a Shaw Rep