dslreports logo
site
 
    All Forums Hot Topics Gallery
spc

spacer




how-to block ads


Search Topic:
uniqs
2
share rss forum feed


cdru
Go Colts
Premium,MVM
join:2003-05-14
Fort Wayne, IN
kudos:7
reply to rsaturns

Re: Contractor Work

said by rsaturns:

Either way this job just got a lot cheaper for me.

How did the job get cheaper? If it wasn't done to spec, it should be done to spec at the contractor's own expense. But you should still be stuck with paying what it was originally going to cost if it had been done right.

I'd also keep an eye on the labor if it's a time and materials contract just to make sure that additional cost doesn't make it's way back in there mysteriously.