| Project: New office build out. So we have decided to move my office from upstairs to downstairs so each kid can have their own room (Teen years coming up) so we have to build the new office downstairs from the ground up. Steps.
Build office. Move network closet down stairs. Move office.
Here is what we got so far. More pics coming. -- [nUll@dcypher ~]$ |
|
 | Why are the studs red? |
|
|
|
 lihtAcryllicht join:2000-07-11 Paradise Valley, AZ | Maybe he's using redwood studs. -- werd |
|
 Zorack join:2001-12-14 Fayetteville, WV Reviews:
·Suddenlink
| reply to Thane_Bitter
Probably specially treated lumber for fire resistance/mold/ect? -- Matt Barlow Rules! Bring him back to Iced Earth! \m/ |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX
1 recommendation | reply to XCOM
Mold resistance. |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| reply to XCOM So we got the walls up/tape/mud/sand it down/texture. -- [nUll@dcypher ~]$ |
|
 | reply to XCOM
Make sure you add 7 ethernet drops per wall like this guy did.
»My addition will take almost 2 miles of Cat 6 |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| WTF... ROFL!  -- [nUll@dcypher ~]$ |
|
 ilikemeI live in a van down by the river.Premium join:2002-08-27 Denton, TX kudos:1 | reply to Oedipus
Only 7? He needs 14! J/K. --
Fiber Optics is the future of high-speed internet access. Stop by the BBR Fiber Optic Forum
|
|
 H_T_R_NPremium join:2011-12-06 Valencia, PA kudos:1 | reply to XCOM
No outlets on the new wall at all, or are they coming? |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| said by H_T_R_N:No outlets on the new wall at all, or are they coming? The systems will not be on the new wall so no outlets need it there. There is plenty of electrical outlets on the existing walls so we are good there. Is going to be too much work to run Cat6 to the wall where the systems are going to be so the idea is to run 100 cat6 cables behind the base board to the systems area. Is hard to picture it right now but let me see if I can come up with a diagram so I can explain it better.
(Yes 100 is a joke... Is going to be 4 runs only ) -- [nUll@dcypher ~]$ |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX | reply to XCOM
Crown molding and base board was installed today. Painting will be done during the week. Door install/Re wiring starts next week end. -- [nUll@dcypher ~]$ |
|
 OctaveanPremium,MVM join:2001-03-31 New York, NY kudos:1 | reply to XCOM
Nice, very nice,.....
Would like to see more,....
BTW, the first picture looks like the studs were put over carpet on the floor,.....? Is that right, if so I have never come across that before. |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| Octavean,
Thanks.... Yes a lot of people has ask me about that and the answer is yes is in top of the carpet for a few reasons.... I wanted minimal damage done to the existing structure in case I ever decided to sell the house and the buyer didn't want the room there or even if one day I just decided to knock it down.
I cut a small square of each carpet area where the anchors are to minimize carpet damage.... I didn't want to cut the whole area out and than having to replace the whole carpet if one day the wall comes down. I like to think of it as some what modular... Others call it ghetto... lol  -- [nUll@dcypher ~]$ |
|
 | reply to XCOM
Err, not to be a PITA but "you never can have too many outlets", and the NEC has rules.
Anyways Wire Mould(TM) makes solutions which would allow you to have power on that wall, be code compliant and be completely removable when/if the wall ever comes out.
Anyways its coming along very fast, you might get it done in a week!  |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| said by Thane_Bitter:Err, not to be a PITA but "you never can have too many outlets", and the NEC has rules.
Anyways Wire Mould(TM) makes solutions which would allow you to have power on that wall, be code compliant and be completely removable when/if the wall ever comes out.
Anyways its coming along very fast, you might get it done in a week!  Mehhh.... True. I guess I can deal with it for now  I am hoping that is all done this week end.. -- [nUll@dcypher ~]$ |
|
 OctaveanPremium,MVM join:2001-03-31 New York, NY kudos:1 | reply to XCOM
I hear you man,...
Octavean don't judge,....  |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| Well guys the office is done.
I will post pics of the complete office during the week. Right now I am debating what am I going to do with the existing network. I do plan to keep it but I just haven't found a good way to extended down stairs....
If you have any ideas please head over to:
»Networking Ideas Questions for a Retro Build.. -- [nUll@dcypher ~]$ |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| reply to XCOM
 equipment. |
Small update.
Equipment is here for the new network.
Panduit 110 Punchdown Block Panduit Cable organizer Cat 5e 1000ft Spindle 3u Rack extending to 6u. -- [nUll@dcypher ~]$ |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
|  110 punchdown-block |  |
ok we made some progress.... We have one part of the punch down block done see pics below... Also the progress pic  -- [nUll@dcypher ~]$ |
|
 stevephl join:2000-11-27 Colorado Springs, CO | Looking good  |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX | Thanks. |
|
 | reply to XCOM
Room looks nice. I'm an amateur, but isn't there a rule about having at most 1/2" of wire exposed at the punch-block? |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| said by Springbok:Room looks nice. I'm an amateur, but isn't there a rule about having at most 1/2" of wire exposed at the punch-block? It is... Just missed some of them... I thought about redoing it bust some of the experts around here gave me the green light  -- [nUll@dcypher ~]$ |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX Reviews:
·flowroute
·Comcast
·voip.ms
·Callcentric
·SIPBRI
| reply to XCOM
Here is an update on the network rack.... (Sorry for the bad pics) -- [nUll@dcypher ~]$ |
|
 | Glad everything worked out for you.. Question I s that 2 cable modems in your rack |
|
 XCOMdigitalnUllPremium join:2002-06-10 Spring, TX | reply to XCOM
Thanks.
In business account they separate data from voice so they give you one tdma modem and one data modem. -- [nUll@dcypher ~]$ |
|