<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28077867</link>
<description><![CDATA[weaseled386 posted : <i>Per TP-76300, Section K, 3.5.3:<br>"Exposed shields of shielded cable shall be protected with two half-lapped layers of electrical tape or heat shrinkable sleeve."</i><br><br>My comment was about breaking the sheath of larger STP cable.  While we do sometimes run standard 4 pair CAT5/6 cable, our typical run is 25 to 100 pair.  The DMX has AMP connectors on the system side.  DS1's are installed in groups of 28, and DS3's are installed in 12's or 24's.  All is shielded cable, and requires tape where we "butt" the cable for termination.<br><br>Although the DMX Metro can be used for ethernet I can only recall two or three customers who've requested it in 8-10 years we've been installing them.  My last Level-3 install was 192 DS3's, but the typical customer (or multi tennant) install is:<br><br>FN-A:  56 DS1's<br>FN-B:  56 DS1's<br>FN-C:  Vacant for OCxx drops<br>FN-D:  24 DS3's<br><br>I know that seems like a lot of DS1's, but they're still used for a TON of things.  If a DISC*S accompanies it, it can eat up to 28.  A Wescom T1 repeater is almost always included, and can eat another 28.]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28077867</guid>
<pubDate>Thu, 07 Mar 2013 09:38:29 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28076392</link>
<description><![CDATA[DarkLogix posted : <div class="bquote"><said>said by <a href="/profile/1544837" onClick="this.blur(); return popup(event,'/uidpop?ajh=1&uid=1544837');">weaseled386</a>:</said><p><div class="bquote"><said>said by <a href="/profile/350435" onClick="this.blur(); return popup(event,'/uidpop?ajh=1&uid=350435');">DKS</a>:</said><p><div class="bquote"><said>said by <a href="/profile/790826" onClick="this.blur(); return popup(event,'/uidpop?ajh=1&uid=790826');">LazMan</a>:</said><p>The copper cabling is brutal, to be honest...   The wraps of black tape at the cable butt, patch cords ty-wrapped to the twisted-pair.<br><br>It'll work, but it's not very neat.<br> </p></div>At least there is no duct tape...  :)<br> </p></div>LOL!  BellSouth used to require us to wrap the ends of shielded cable with grey electrical tape.  It should wrap around the conductors 2 times, and then up to the sheath 2 times.  Cut cleanly vs "ripping."  A non-sheilded cable didn't require tape.<br><br>Now we're allowed to use black, but it looks terrible.  It was a cost saving measure, because the price of 1 roll of grey can buy 10 rolls of black!<br> </p></div>Was that with propper STP plugs and STP cable or UTP plugs with STP cable?<br><br>Because with an STP plug its easy to tell, thus I wouldn't see the reason for the tape.<br><br>And if STP cable with UTP plugs then why not do it right and get STP plugs.<br><small>--<br>&raquo;<A HREF="/forum/r27817736-Death-Star-Petition">Death Star Petition</A></small>]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28076392</guid>
<pubDate>Wed, 06 Mar 2013 19:27:33 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28076226</link>
<description><![CDATA[TomS_ posted : Ah memories.<br><br>I remember most of this stuff like it was yesterday. :-/]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28076226</guid>
<pubDate>Wed, 06 Mar 2013 18:35:54 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28075554</link>
<description><![CDATA[weaseled386 posted : <div class="bquote"><said>said by <a href="/profile/350435" onClick="this.blur(); return popup(event,'/uidpop?ajh=1&uid=350435');">DKS</a>:</said><p><div class="bquote"><said>said by <a href="/profile/790826" onClick="this.blur(); return popup(event,'/uidpop?ajh=1&uid=790826');">LazMan</a>:</said><p>The copper cabling is brutal, to be honest...   The wraps of black tape at the cable butt, patch cords ty-wrapped to the twisted-pair.<br><br>It'll work, but it's not very neat.<br> </p></div>At least there is no duct tape...  :)<br> </p></div>LOL!  BellSouth used to require us to wrap the ends of shielded cable with grey electrical tape.  It should wrap around the conductors 2 times, and then up to the sheath 2 times.  Cut cleanly vs "ripping."  A non-sheilded cable didn't require tape.<br><br>Now we're allowed to use black, but it looks terrible.  It was a cost saving measure, because the price of 1 roll of grey can buy 10 rolls of black!]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28075554</guid>
<pubDate>Wed, 06 Mar 2013 16:20:56 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28075505</link>
<description><![CDATA[DKS posted : <div class="bquote"><said>said by <a href="/profile/790826" onClick="this.blur(); return popup(event,'/uidpop?ajh=1&uid=790826');">LazMan</a>:</said><p>The copper cabling is brutal, to be honest...   The wraps of black tape at the cable butt, patch cords ty-wrapped to the twisted-pair.<br><br>It'll work, but it's not very neat.<br> </p></div>At least there is no duct tape...  :)<br><small>--<br>Need-based health care not greed-based health care.</small>]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28075505</guid>
<pubDate>Wed, 06 Mar 2013 16:11:45 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28074508</link>
<description><![CDATA[weaseled386 posted : Sad DMX Metro is sad :(<br><br>I've installed a thousand of them, and there is no way I could get away with that!  My companies internal QA team would chew it up, and if they missed anything AT&T's QA team would rape me.<br><br>Ok, maybe not a thousand DMX Metros... ~500 of them were probably DMXtend's!]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28074508</guid>
<pubDate>Wed, 06 Mar 2013 12:23:41 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28073914</link>
<description><![CDATA[LazMan posted : &raquo;<A HREF="/speak/slideshow/22613699?c=1443031&ret=L2ZvcnVtL3IyMjQyNjU3Ny1NeS1maXJzdC1hdHRlbXB0LWF0LWNhYmxlLWxhY2luZy0%3D">/speak/slidesh&middot;&middot;&middot;luZy0%3D</A><br><br>An older pic, but it gives you an idea of some other ways it could have been done.]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28073914</guid>
<pubDate>Wed, 06 Mar 2013 10:11:19 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28073903</link>
<description><![CDATA[voxframe posted : I was going to say that too.<br><br>Installing a beautiful piece of equipment like that with dogshit (Sorry but that really is dogshit) copper wiring.<br><br>No no no excuse for that to be in any kind of data environment. That's the work of a home phone installer on a bad day.]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28073903</guid>
<pubDate>Wed, 06 Mar 2013 10:08:27 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28073716</link>
<description><![CDATA[LazMan posted : The copper cabling is brutal, to be honest...   The wraps of black tape at the cable butt, patch cords ty-wrapped to the twisted-pair.<br><br>It'll work, but it's not very neat.]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28073716</guid>
<pubDate>Wed, 06 Mar 2013 09:18:29 EDT</pubDate>
</item>

<item>
<title>Re: Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Re-Final-Level3-Installation-28072468</link>
<description><![CDATA[sk1939 posted : Deceivingly spartan. ]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Re-Final-Level3-Installation-28072468</guid>
<pubDate>Tue, 05 Mar 2013 20:45:46 EDT</pubDate>
</item>

<item>
<title>Final Level(3) Installation</title>
<link>http://www.dslreports.com/forum/Final-Level3-Installation-28062448</link>
<description><![CDATA[d0nni3q posted : I started this (<br>&raquo;<A HREF="/forum/r26061280-Level-3-Installation">Level(3) Installation</A>) thread awhile ago. I wanted to provide the final pictures.<br><br>The final picture also has PRI hand-offs as well as the Ethernet. The Ethernet is Internet and MPLS.<div class="borderless"><TABLE WIDTH=95% align=center border=0 CELLPADDING=4"><TR><TD ALIGN=CENTER VALIGN=CENTER BGCOLOR=#FFFFFF nwrap COLSPAN=3 WIDTH=100%><A HREF="/speak/slideshow/28062448?c=2078880&ret=L2ZvcnVtL3IyODA2MjQ0OC54bWw%3D"><IMG class="apic" BORDER=0 TITLE="121626 bytes" WIDTH=600 HEIGHT=450 SRC="/r0/download/2078880.thumb600~e0ab818d56f8ee0ef0fdd20aa1fc505c/lvl3_01.jpg/thumb.jpg" ALT="Click for full size"></A><br>Alcatel Lucent - Front</TD></TR><TR><TD ALIGN=CENTER VALIGN=CENTER BGCOLOR=#FFFFFF nwrap COLSPAN=3 WIDTH=100%><A HREF="/speak/slideshow/28062448?c=2078881&ret=L2ZvcnVtL3IyODA2MjQ0OC54bWw%3D"><IMG TITLE="100462 bytes" BORDER=0 WIDTH=600 HEIGHT=800 SRC="/r0/download/2078881~90d85da5e35e5afb9b8260b47a4ed643/lvl3_02.jpg"></A><br>Alcatel Lucent - Back</TD></TR><TR><TD ALIGN=CENTER VALIGN=CENTER BGCOLOR=#FFFFFF nwrap COLSPAN=3 WIDTH=100%><A HREF="/speak/slideshow/28062448?c=2078882&ret=L2ZvcnVtL3IyODA2MjQ0OC54bWw%3D"><IMG class="apic" BORDER=0 TITLE="123817 bytes" WIDTH=600 HEIGHT=450 SRC="/r0/download/2078882.thumb600~1d467824ce57392edf978898f2174444/lvl3_03.jpg/thumb.jpg" ALT="Click for full size"></A><br>Ethernet Hand-Off</TD></TABLE></div>]]></description>
<guid isPermaLink="true">http://www.dslreports.com/forum/Final-Level3-Installation-28062448</guid>
<pubDate>Sat, 02 Mar 2013 22:41:33 EDT</pubDate>