 GooberPremium join:2000-12-17 Naperville, IL kudos:5 Reviews:
·Dish Network
| said by Jack_in_VA:Question did the local inspector sign off on it before the new panel was re-energized? I assume you did get a permit? If so you should be ok. Yes. This is all done using permits.
said by jack b:Looks pretty good, take a closer look, the circled neutral looks a little gnarly, and the top left feed conductor doesn't appear to be fully engaged in the main lug. You should see a little copper on the outer side of the lug. I'll take a look and see whether he's still working on things and whether he's fixed those circled items. Otherwise I'll ask him about it. -- Awesome. More handouts, food stamps, welfare and entitlements to come. I'm so proud. |