Conduit coming into main panel - Next size KO is burned out completely and conduit is loose


Conduit entering bottom of main panel


Conduit entering side of main panel


4/0 coming into building - 4/0 is connected to chemical rod, bare copper runs up wall to apparent suppression unit


Where bare copper touched electrical conduit


Where bare copper touched electrical conduit


Conduit entering a sub panel


Conduit entering top of Main panel - same conduit as first picture


Conduit entering Sub Panel


Scorch marks on panel cover


Arc marks on inside of box


Suppressor?


Outlets where their equipment was plugged in


Conduit entering side of heater


Conduit entering side of main panel


Conduit entering bottom of mail panel


Conduits entering bottom of Main panel


Meter base and #8 bare copper running to 3/8" ground rod


Ground rod for Electrical service, phone nid is bonded here as well. To the right is the 4/0 enteringthe building.


One of the connections they left behind


return to topic
Size: [constrained] · original

Conduit coming into main panel - Next size KO is burned out completely and conduit is loose